- Al-Anzi, F.S., & Allahverdi, A. (2009). Heuristics for a two-stage assembly flow shop with bicriteria of maximum lateness and makespan. Computers & Operations Research, 36(9), 2682-2689.
- Armstrong, R., Su, G., & Lei, L. (2008). A Zero-inventory Production and Distribution Problem with a Fixed Customer Sequence. Annals of Operations Research, 159(1), 395–414.
- Atashpaz-Gargari E., & Lucas, C. (2007). Imperialist competitive algorithm: an algorithm for optimization inspired by imperialistic competition, in: Proceedings of IEEE Congress on Evolutionary Computation, Singapore, 25-28 Sept, 4661–4667.
- Chang, Y. C., & Lee, C. Y. (2004). Machine Scheduling with Job Delivery Coordination. European Journal of Operational Research, 158(2), 470–487.
- Chen, Z. L., & Vairaktarakis, G. L. (2005). Integrated Scheduling of Production and Distribution Operations. Management Science, 51(4), 614–628
- Cheng, T.C.E. (1990). Analysis of material flow in a job shop with assembly operations, International Journal of Production Research, 28(7): 1369-1383.
- Chopra, S., & Meindle, P. (2004). Supply chain management- strategy, planning and operation. 2 nd Ed. Prentic Hall.
- Condotta, A., Knust, S., Dimitri, M., & Shakhlevich, N.V. (2013). Tabu Search and Lower Bounds for a Combined Production–Transportation Problem. Computers & Operations Research, 40(3), 886–900.
- Daneshamooz, F., Jabbari, M. and Fattahi, P. (2015). A model for job shop scheduling with a parallel assembly stage to minimize makespan. Journal of Industrial Engineering Research in Production Systems, 2(4), 39-53. (In Persian)
- Dimyati, T. (2007). Minimizing production flow time in a process and assembly job shop, Proceedings of the International Seminar on Industrial engineering and Management, Jakarta, 68- 73.
- Farahani, P., Martin, G., & Günther, H.O. (2012). Integrated Production and Distribution Planning for Perishable Food Products. Flexible Services and Manufacturing Journal, 24(1), 28–51.
- Fattahi, P., Hosseini, S.M.H., Jolai, F., & Tavakkoli-Moghaddam, R. (2014). A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations. Applied Mathematical Modelling, 38(1), 119-134.
- Fattahi, P., Mohammadi, E., & Daneshamooz, F. (2019). Providing a Harmony Search Algorithm for Solving Multi Objective Job Shop Scheduling Problem with Considering an Assembly Stage and Lot Streaming. Journal of Industrial Management Perspective, 9(1), 61-86. (In Persian)
- Fontes, B.M.M., & Homayouni, S.M. (2019). Joint production and transportation scheduling in flexible manufacturing systems. Journal of Global Optimization, , 74(4), 879-908.
- Frazzona, E.M., Albrechta, A., Piresa, M., Israela, E., Kückc, M., & Freitagc, M. (2018). Hybrid approach for the integrated scheduling of production and transport processes along supply chains. International Journal of Production Research, 56(5), 2019-2035.
- Garey, M.R., Johnson, D.S., & sethi, R. (1976). The Complexity of flow shop and job shop scheduling. Mathematics of Operation Research, 1(2), 117-129.
- Geismar, H. N., Laporte, G., Lei, L., & Sriskandarajah, C. (2008). The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan. Informs Journal on Computing, 20(1), 21–33.
- Gholami, H.R., Mehdizadeh, E., Naderi, B. (2018). Mathematical modeling and imperialist competitive algorithm for Assembly Flowshops. Journal of Industrial Management Perspective, 8(1), 93-111. (In Persian)
- Hall, L.A., & Shmoys, D. B. (1992). Jackson’s rule for single-machine scheduling: Making a good heuristic better, Math. Oper. Res, 17:22–35.
- Hajiaghaei-Keshteli, M., Aminnayeri, M., & Fatemi Ghomi, S.M.T. (2014). Integrated Scheduling of Production and Rail Transportation. Computers & Industrial Engineering, 74, 240–256.
- Jia, Z-H., Zhuo, X-X., Leung, Y-T., & Li, K. (2019). Integrated production and transportation on parallel batch machines to minimize total weighted delivery time. Computers & Operations Research, 102, 39-51.
- Kang, H.Y., Peam, W. L. Pearn, Chung, I.P., & Lee, A.H. (2015). An Enhanced Model for the İntegrated Production and Transportation Problem in a Multiple Vehicles Environment. Soft Computing, 20(4), 1415–1435.
- Kirkpatrick, S., Gelatt, C. D., Jr., & Vecchi, M. P. (1983). Optimization by simulated annealing. Science, 220: 671-680.
- Lee, C.Y., Cheng, T.C.E., & Lin, B.M.T. (1993). Minimizing the makespan in the 3- machine assembly-type flow shop-scheduling problem. Management Science, 39(5), 616-625.
- Lee, J., Kim, B.I., Johnson, A.L., & Lee, K. (2014). The Nuclear Medicine Production and Delivery Problem. European Journal of Operational Research, 236(2), 461–472.
- Li, C. L., & Vairaktarakis, G. (2007). Coordinating Production and Distribution of Jobs with Bundling Operations. IIE Transactions, 39(2), 203–215.
- Low, C., Chang, C.M., Li, R.K., & Huang, C.L. (2014). Coordination of Production Scheduling and Delivery Problems with Heterogeneous Fleet. International Journal of Production Economics, 153, 139–148.
- Manne, A.S. (1960). On the job shop-scheduling problem. Operation Research, 8(2), 219-223.
- Metropolis, N., Rosenbluth, A. W., Rosenbluth, M. N., Teller, A. H., & Teller, E. (1953). Equation of state calculation by east computing machines. The Journal of Chemical Physics, 21, 1087-1091.
- Potts, C. N. (1980). Analysis of a heuristic for one machine sequencing with release dates and delivery times. Oper. Res, 28, 1436–1441.
- Rahimi, H., Azar, A., & Rezaei-Pandari, A. (2015). Designing a Multi Objective Job Shop Scheduling Model and solving it by Simulated Annealing. Journal of Industrial Management Perspective, 5(3), 39-63. (In Persian)
- Shokrollahpour, E., Zandieh, M., & Dorri, B. (2011). A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flow shop problem. International Journal of Production Research, 49(11), 3087-3103.
- Tanimizu, Y., ITO, H., & Matsui, K. (2016). Integrated Production and Transportation Scheduling for Low-Carbon Supply Chains, Sustainability through Innovation in Product Life Cycle Design, 399-415.
- Torabzadeh, E., & Zandieh, M. (2010). Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flow shop. Advances in Engineering Software, 41(10-11), 1238-1243.
- Ullrich, C.A. (2012). Supply Chain Scheduling: Makespan Reduction Potential. International Journal of Logistics Research and Applications, 15(5), 323–336.
- Varadharajan, T. K., & Rajendran, C. (2005). A Multi-Objective Simulated-Annealing Algorithm for Scheduling in Flow shops to Minimize the Makespan and Total Flow time of Jobs. European Journal of Operational Research, 167(3), 772-795.
- Viergutz, C., & Knust. S. (2014). Integrated Production and Distribution Scheduling with Lifespan Constraints. Annals of Operations Research, 213(1), 293–318.
- Wagner, H. (1959). An integer linear-programming model for machine scheduling, Naval Research logistics quarterly, 6(2): 131-140.
- Wang, K., Ma, W.Q., Luo, H., & Qin, H. (2016). Coordinated scheduling of production and transportation in a two-stage assembly flow shop, International Journal of Production Research, 6891-6911.
- Woeginger, G. J. (1994). Heuristics for parallel machine scheduling with delivery times. Acta Inform, 31, 503–512.
- Woeginger, G. J. (1998). A polynomial-time approximation scheme for single-machine sequencing with delivery times and sequence- independent batch set-up times. J. Scheduling one, 1(2), 79–87.
- Zhang, R.A. (2011). Simulation-based Genetic Algorithm for Job Shop Scheduling with Assembly Operations. International Journal of Advancements in Computing Technology, 3(10).
|