- Adamtey, S., & Onsarigo, L. (2018). Analysis of pipe-bursting construction risks using probability-impact model. Journal of Engineering, Design and Technology, 16(3), 461-477.
- Ahmadi Moghadam, J., Motahari Farimani, N., & Kazemi, M. (2021). Developing a Project Planning Model Considering the Executive Methods and the Rework Activity. Journal of Industrial Management Perspective, 11(1), 147-173. (In Persian).
- Al-Turki, U., Duffuaa, S., & Bendaya, M. (2019). Trends in turnaround maintenance planning: literature review. Journal of quality in maintenance engineering. 25(2), 253-271.
- Alinezhad, A., & Khalili, J. (2019). SWARA Method. In New Methods and Applications in Multiple Attribute Decision Making (MADM) (pp. 99-102): Springer.
- Arunraj, N., & Maiti, J. (2007). Risk-based maintenance—Techniques and applications. Journal of hazardous materials, 142(3), 653-661.
- Badiru, A. B., & Osisanya, S. O. (2016). Project management for the oil and gas industry: a world system approach, CRC Press.
- Barghi, B., & Shadrokh, S. S. (2020). Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions. Heliyon, 6(1),
- Bashardoost, P., Nasirzadeh, F., & Mohtashemi, N. N. (2018, March). An integrated fuzzy-DEMATEL approach to project risk analysis. In 2018 7th International Conference on Industrial Technology and Management (ICITM)(pp. 411-416). IEEE.
- Bevilacqua, M., Ciarapica, F. E., & Giacchetta, G. (2009). Critical chain and risk analysis applied to high-risk industry maintenance: A case study. International Journal of Project Management, 27(4), 419-432.
- Bevilacqua, M., Ciarapica, F. E., Giacchetta, G., & Marchetti, B. (2012). Development of an innovative criticality index for turnaround management in an oil refinery. International Journal of Productivity and Quality Management, 9(4), 519-544.
- Bissonette, M. M. (2016). Project risk management: a practical implementation approach. Project Management Institute.
- Chang, P. T., Huang, L. C., & Lin, H. J. (2000). The fuzzy Delphi method via fuzzy statistics and membership function fitting and an application to the human resources. Fuzzy sets and systems, 112(3), 511-520.
- Chen, C. T., Lin, C. T., & Huang, S. F. (2006). A fuzzy approach for supplier evaluation and selection in supply chain management. International journal of production economics, 102(2), 289-301.
- Cheng, C. H., & Lin, Y. (2002). Evaluating the best main battle tank using fuzzy decision theory with linguistic criteria evaluation. European journal of operational research, 142(1), 174-186.
- Cheraghi, M., Karbassi, A., Monavari, S. M., & Baghvand, A. (2018). Environmental risk management associated with the development one of oil fields in southwestern Iran using AHP and FMEA methods. Anthropogenic Pollution Journal, 2(2), 33-40.
- Cooper, D. F., Grey, S., Raymond, G., & Walker, P. (2013). Project risk management guidelines: managing risk in large projects and complex procurements: Wiley.
- Ebrahimnejad, S., Mousavi, S. M., & Seyrafianpour, H. (2010). Risk identification and assessment for build–operate–transfer projects: A fuzzy multi attribute decision making model. Expert systems with Applications, 37(1), 575-586.
- Ebrahimnejad, S., Mousavi, S. M., Tavakkoli-Moghaddam, R., & Heydar, M. (2014). Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis. Journal of Intelligent & Fuzzy Systems, 26(2), 949-959.
- Fouladgar, M. M., Yazdani-Chamzini, A., & Zavadskas, E. K. (2012). Risk evaluation of tunneling projects. Archives of civil and mechanical engineering, 12, 1-12.
- Ghorabaee, M. K., Amiri, M., Zavadskas, E. K., & Antucheviciene, J. (2018). A new hybrid fuzzy MCDM approach for evaluation of construction equipment with sustainability considerations. Archives of Civil and Mechanical Engineering, 18(1), 32-49.
- Ghorabaee, M. K., Amiri, M., Zavadskas, E. K., Turskis, Z., & Antucheviciene, J. (2017). A new multi-criteria model based on interval type-2 fuzzy sets and EDAS method for supplier evaluation and order allocation with environmental considerations. Computers & Industrial Engineering, 112, 156-174.
- Ghorabaee, M. K., Zavadskas, E. K., Amiri, M., & Turskis, Z. (2016). Extended EDAS method for fuzzy multi-criteria decision-making: an application to supplier selection. International journal of computers communications & control, 11(3), 358-371.
- Grzegorzewski, P., & Mrówka, E. (2005). Trapezoidal approximations of fuzzy numbers. Fuzzy Sets and Systems, 153(1), 115-135.
- Habibi, A., Jahantigh, F. F., & Sarafrazi, A. (2015). Fuzzy Delphi technique for forecasting and screening items. Asian Journal of Research in Business Economics and Management, 5(2), 130-143 .
- Hatefi, S. M., & Tamošaitienė, J. (2019). An integrated fuzzy DEMATEL-fuzzy ANP model for evaluating construction projects by considering interrelationships among risk factors. Journal of Civil Engineering and Management, 25(2), 114-131.
- Heins, W., & Röling, M. (1995). Application of multiattribute theory in a safety monitor for the planning of maintenance jobs. European journal of operational research, 86(2), 270-280.
- Hey, R. B. (2019). Turnaround Management for the Oil, Gas, and Process Industries: A Project Management Approach. Gulf Professional Publishing.
- Hillson, D. (2012). Practical project risk management: The ATOM methodology. Berrett-Koehler Publishers.
- Honari Choobar, F., & Nazari, A. (2012). Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method. International Journal of Engineering, 25(2), 107-120.
- Hsu, Y. L., Lee, C. H., & Kreng, V. B. (2010). The application of Fuzzy Delphi Method and Fuzzy AHP in lubricant regenerative technology selection. Expert Systems with Applications, 37(1), 419-425.
- Husin, S., Fachrurrazi, F., Rizalihadi, M., & Mubarak, M. (2019). Implementing fuzzy TOPSIS on project risk variable ranking. Advances in Civil Engineering, 2019.
- Ishikawa, A., Amagasa, M., Shiga, T., Tomizawa, G., Tatsuta, R., & Mieno, H. (1993). The max-min Delphi method and fuzzy Delphi method via fuzzy integration. Fuzzy sets and systems, 55(3), 241-253 .
- Islam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017). Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects. Advanced Engineering Informatics, 33, 112-131.
- Jahn, F., Cook, M., & Graham, M. (2008). Hydrocarbon Exploration and Production. Elsevier Science.
- Kahraman, C., Keshavarz Ghorabaee, M., Zavadskas, E. K., Cevik Onar, S., Yazdani, M., & Oztaysi, B. (2017). Intuitionistic fuzzy EDAS method: an application to solid waste disposal site selection. Journal of Environmental Engineering and Landscape Management, 25(1), 1-12
- KarimiAzari, A., Mousavi, N., Mousavi, S. F., & Hosseini, S. (2011). Risk assessment model selection in construction industry. Expert Systems with Applications, 38(8), 9105-9111.
- Kassem, M. A., Khoiry, M. A., & Hamzah, N. (2019). Risk factors in oil and gas construction projects in developing countries: A case study. International Journal of Energy Sector Management, 13(4), 846-861.
- Kaufmann, A., & Gupta, M. M. (1988). Fuzzy mathematical models in engineering and management science. Elsevier Science Inc.
- Keršuliene, V., Zavadskas, E. K., & Turskis, Z. (2010). Selection of rational dispute resolution method by applying new step‐wise weight assessment ratio analysis (SWARA). Journal of business economics and management, 11(2), 243-258.
- Keshavarz Ghorabaee, M., Zavadskas, E. K., Olfat, L., & Turskis, Z. (2015). Multi-criteria inventory classification using a new method of evaluation based on distance from average solution (EDAS). Informatica, 26(3), 435-451.
- Klir, G. J., & Yuan, B. (1995). Fuzzy sets and fuzzy logic:Theory and application. New Jersey: Prentice-Hall Inc.
- Kobbacy, K. A. H., & Murthy, D. P. (2008). Complex system maintenance handbook. Springer Science & Business Media.
- Kraidi, L., Shah, R., Matipa, W., & Borthwick, F. (2019). Analyzing the critical risk factors associated with oil and gas pipeline projects in Iraq. International Journal of Critical Infrastructure Protection, 24, 14-22.
- Kuo, Y. F., & Chen, P. C. (2008). Constructing performance appraisal indicators for mobility of the service industries using Fuzzy Delphi Method. Expert systems with applications, 35(4), 1930-1939.
- Kuo, Y. C., & Lu, S. T. (2013). Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects. International Journal of Project Management, 31(4), 602-614.
- Lenahan, T. (2011). Turnaround, shutdown and outage management: Effective planning and step-by-step execution of planned maintenance operations. Elsevier.
- Li, J., & Zou, P. X. (2011). Fuzzy AHP-based risk assessment methodology for PPP projects. Journal of Construction Engineering and Management, 137(12), 1205-1209.
- Lin, Z., & Jianping, Y. (2011). Risk assessment based on fuzzy network (F-ANP) in new campus construction project. Systems engineering procedia, 1, 162-168.
- Liu, J., Li, Q., & Wang, Y. (2013). Risk analysis in ultra deep scientific drilling project—A fuzzy synthetic evaluation approach. International Journal of Project Management, 31(3), 449-458.
- Liu, J., & Wei, Q. (2018). Risk evaluation of electric vehicle charging infrastructure public-private partnership projects in China using fuzzy TOPSIS. Journal of Cleaner Production, 189, 211-222.
- Ma, M., Kandel, A., & Friedman, M. (2000). A new approach for defuzzification. Fuzzy sets and Systems, 111(3), 351-356.
- Mardani, A., Nilashi, M., Zakuan, N., Loganathan, N., Soheilirad, S., Saman, M. Z. M., & Ibrahim, O. (2017). A systematic review and meta-Analysis of SWARA and WASPAS methods: Theory and applications with recent fuzzy developments. Applied Soft Computing, 57, 265-292.
- Marhavilas, P.-K., Koulouriotis, D., & Gemeni, V. (2011). Risk analysis and assessment methodologies in the work sites: On a review, classification and comparative study of the scientific literature of the period 2000–2009. Journal of Loss Prevention in the Process Industries, 24(5), 477-523.
- Mohaghar, A., Khorasani A. R. (2020). Designing the Model of Assessing the Risk management of Automaker Companies in Iran: Grounded Theory. Journal of Industrial Management Perspective, 10(3), 9-28. (In Persian).
- Moradpour, S., Ebrahimnejad, S., Mehdizadeh, E., & Mohamadi, A. (2011). Using hybrid fuzzy PROMETHEE II and fuzzy binary goal programming for risk ranking: A case study of highway construction projects. Journal of Optimization in Industrial Engineering, (9), 47-55.
- Murray, T. J., Pipino, L. L., & van Gigch, J. P. (1985). A pilot study of fuzzy set modification of Delphi. Human Systems Management, 5(1), 76-80 .
- Nadizadeh, A., Ranjbar, H., & Moubed, M. (2020). Periodic Inspection Optimization for a Two-Component System with Dependent Failures. Journal of Industrial Management Perspective, 10(2), 83-110. (In Persian).
- Nguyen, A. T., Nguyen, L. D., Le-Hoai, L., & Dang, C. N. (2015). Quantifying the complexity of transportation projects using the fuzzy analytic hierarchy process. International journal of project management, 33(6), 1364-1376.
- Nieto-Morote, A., & Ruz-Vila, F. (2011). A fuzzy AHP multi-criteria decision-making approach applied to combined cooling, heating, and power production systems. International Journal of Information Technology & Decision Making, 10(03), 497-517.
- Othman, A. A. E., & Abdelwahab, N. M. A. (2018). Achieving sustainability through integrating risk management into the architectural design process. Journal of Engineering, Design and Technology, 16(1), 25-43.
- (2017). A Guide to the Project Management Body of Knowledge (PMBOK Guide): Agile Practice Guide. Project Management Institute.
- (2019). Standard for Risk Management in Portfolios, Programs, and Projects. In: Project Management Institute.
- Pritchard, C. L. (2014). Risk management: concepts and guidance. CRC Press.
- Rajagopalan, S., Sahinidis, N. V., Amaran, S., Agarwal, A., Bury, S. J., Sharda, B., & Wassick, J. M. (2017). Risk analysis of turnaround reschedule planning in integrated chemical sites. Computers & Chemical Engineering, 107, 381-394.
- Raz, T., & Hillson, D. (2005). A comparative review of risk management standards. Risk Management, 7(4), 53-66.
- Seiti, H., & Hafezalkotob, A. (2019). Developing the R-TOPSIS methodology for risk-based preventive maintenance planning: A case study in rolling mill company. Computers & Industrial Engineering, 128, 622-636.
- Sekaran, U., & Bougie, R. (2016). Research methods for business: A skill building approach. John Wiley & Sons.
- Serrano-Gomez, L., & Munoz-Hernandez, J. I. (2019). Monte Carlo approach to fuzzy AHP risk analysis in renewable energy construction projects. PloS one, 14(6),
- Subramanyan, H., Sawant, P. H., & Bhatt, V. (2012). Construction project risk assessment: development of model based on investigation of opinion of construction project experts from India. Journal of construction engineering and management, 138(3), 409-421.
- Tavakkoli-Moghaddam, R., Mousavi, S., & Hashemi, H. (2011). A fuzzy comprehensive approach for risk identification and prioritization simultaneously in EPC projects. Risk management in environment, production and economy, 123-146.
- Taylan, O., Bafail, A. O., Abdulaal, R. M., & Kabli, M. R. (2014). Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing, 17, 105-116.
- Valipour, A., Yahaya, N., Md Noor, N., Kildienė, S., Sarvari, H., & Mardani, A. (2015). A fuzzy analytic network process method for risk prioritization in freeway PPP projects: an Iranian case study. Journal of Civil Engineering and Management, 21(7), 933-947.
- Valipour, A., Sarvari, H., & Tamošaitiene, J. (2018). Risk assessment in PPP projects by applying different MCDM methods and comparative results analysis. Administrative Sciences, 8(4),
- Wang, L., Zhang, H. Y., Wang, J. Q., & Li, L. (2018). Picture fuzzy normalized projection-based VIKOR method for the risk evaluation of construction project. Applied Soft Computing, 64, 216-226.
- Ward, S. C., & Chapman, C. (2003). Project risk management. processes, techniques and insights.
- Willumsen, P., Oehmen, J., Stingl, V., & Geraldi, J. (2019). Value creation through project risk management. International Journal of Project Management, 37(5), 731-749.
- Wu, Y., & Zhou, J. (2019). Risk assessment of urban rooftop distributed PV in energy performance contracting (EPC) projects: an extended HFLTS-DEMATEL fuzzy synthetic evaluation analysis. Sustainable Cities and Society, 47, 101-524.
- Xia, N., Wang, X., Wang, Y., Yang, Q., & Liu, X. (2017). Lifecycle cost risk analysis for infrastructure projects with modified Bayesian networks. Journal of Engineering, Design and Technology, 15(1) , 79-103.
- Yager, R. R. (1993). Fuzzy screening systems. In Fuzzy Logic (pp. 251-261). Springer, Dordrecht.
- Yan, W., Baoguo, L., & Yi, Q. (2015). Fuzzy analytic network process and its application in tunnel engineering risk analysis. Electronic Journal of Geotechnical Engineering, 20, 6685-6701.
- Yazdani, M., Alidoosti, A., & Zavadskas, E. K. (2011). Risk analysis of critical infrastructures using fuzzy COPRAS. Economic research-Ekonomska istraživanja, 24(4), 27-40.
- Yazdani, M., Abdi, M. R., Kumar, N., Keshavarz-Ghorabaee, M., & Chan, F. T. (2019). Improved decision model for evaluating risks in construction projects. Journal of Construction Engineering and Management, 145(5),
- Yazdani-Chamzini, A., Yakhchali, S. H., & Mahmoodian, M. (2013). Risk ranking of tunnel construction projects by using the ELECTRE technique under a fuzzy environment. International Journal of Management Science and Engineering Management, 8(1), 1-14.
- Zeng, J., An, M., & Smith, N. J. (2007). Application of a fuzzy based decision making methodology to construction project risk assessment. International Journal of Project Management, 25(6), 589-600.
|