- Alto´e, W., Bissoli, D., Mauri, G., & Amaral, A. (2018). A clustering search metaheuristic for the bi-objective flexible job-shop scheduling problem, XLIV Latin American Computer Conference, 158-166.
- Asadizadeh, Y., Azizi, M., & Hamzeh, Y. (2018). Determination and ranking cleaner production criteria by using analy. Iranian Journal of Wood and Paper Industries, 8(4), 573-584 (In Persian).
- Aurich, J. C., Yang, X., Schröder, S., Hering-Bertram, M., Biedert, T., Hagen, H., & Hamann, B. (2021). Noise investigation in manufacturing systems: An acoustic simulation and virtual reality enhanced method. CIRP Journal of Manufacturing Science and Technology, 5(4), 337-347.
- Behnamian, J. (2016). Solving Complex Optimization Problems Methods and Algorithms. Bu-Ali Sina University Press (In Persian).
- Chen, c., Jiy, Z., & Wangz, Y. (2018). NSGA-II applied to dynamic flexible job shop scheduling problems with machine breakdown, Modern Physics Letters B, 32, 18401111- 18401119.
- Driss, E., Mallouli, R., & Hachicha, W. (2018). Mixed Integer Programming for job Shop Scheduling Problem with Seprable Sequence-Dependent Setup Times. American Journal of Mathematical and Computational Science, 3(1), 31-36.
- Fakhrzad, M.B., Sadeghieh, and A., & Emami, L. (2013). A New Multi-Objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm. International Journal of Engineering, 26(2), 207-218.
- Gholipour Kanani, Y., Tavakkoli Moghaddam, R., Tabari, M., Jafari Zarandini, Y., & Aryanezhad, M.B. (2011). Solving a Novel Multi-Objective Scheduing Problem in a Cellular Manufacturing System by a Hybrid Algorithm. Journal of Production and Operations Management, 2(2), 1-18 (In Persian).
- Golmohammadi, R. (2017). Oel Assessment Guideline for Noise and Vibration, Ministry of Health and Medical Education Environmental and Occupational Health Center (In Persian).
- Gonzalez, M., Vela, C., & Varela. R. (2015). Scatter Search with Path Relinking for the Flexible Job Shop Scheduling Problem. European Journal of Operational Research, 245(1), 1-31.
- Heydari, M., & Aazami, A. (2018). Minimizing the maximum tardiness and makespan criteria in a job-shop scheduling problem with sequence dependent setup times. Journal of Industrial and Systems Engineering, 11(2), 134-150.
- Huang, R., & Yu, S. (2016). Two-stage multiprocessor flow shop scheduling with deteriorating maintenance in cleaner production. Journal of Cleaner Production, 135, 276-283.
- Jamshidi, B., Asabati, M., & Ghanian, I. (2012). Common methods of noise reduction in the textile industry. Journal of Mechanical Engineering and Vibration, 3(1), 11-15 (In Persian).
- Li,, Huang, W., Wu, R., & Guo, K. (2020). An improved artificial bee colony algorithm for solving multi-objective low-carbon flexible job shop scheduling problem, Applied Soft Computing, 95, 1-14.
- Liu, Q., Tian, Y., Wang, C., Chekem, F., & Sutherland, J. (2017). Flexible job shop scheduling for reduced manufacturing carbon footprint. Journal of Manufacturing Science and Engineering, 140(6), 1-9.
- Lu, Y., & Jiang, T. (2019). Bi-Population Based Discrete Bat Algorithm for the Low-Carbon Job Shop Scheduling Problem, IEEE Access, 7, 14513-14522.
- Min, D., Dunbingb, T., Adrianac, G., & Miguel, S. (2019). Multi-objective optimization for energy-efficient flexible job-shop scheduling problem with transportation constraints, Robotics and Computer Integrated Manufacturing, 59, 143-157.
- Molavi, B, Esmaelian, M., Ansari, R. (2012). Identifying and Prioritizing Agility Drivers Using FTOPSISAnd Fractional Programming Approach, Journal of Industrial Management Perspective, 2(1), 91-114. (In Persian)
- Momeni, M. (2014). New Topics in Operations Research, Tehran: Management School Publications, (In Persian).
- Mohtashami, A., & Sagharichiha, M.N. (2018). Prioritizing Order Picking from Storage and Transferring to Production Department Based on a New Mathematical Model and Multi-objective Meta-heuristic Algorithms. International Journal of Industrial Engineering & Production Management, 28(1), 69-86 (In Persian).
- Naser Sadrabadi, A., & Sattarkhan, M.H. (2014). A binary programming model for parallel machines scheduling in a multi-product system. The Journal of Industrial Management Perspective, 4(2), 139-156. (In Persian)
- Nouri, H., Driss, O., & Ghedira, K. (2018). Solving the flexible job shop problem by hybrid Metaheuristics-based multi agent model. Journal of Engineering International, 14, 1-14.
- Rahimi, H., Azar, A., & Rezaei Pandari. (2015). Designing a Multi Objective Job Shop Scheduling Model and Solving itby Simulated Annealing. The Journal of Industrial Management Perspective, 5(3), 39-63. (In Persian)
- Rohaninejad, M., Kheirhkah, A., Fattahi, P., & Vahid-Nouri, B. (2015). A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem. The International Journal of Advanced Manufacturing Technology, 77, 51–66.
- Seng, D.W., Li, J.W., Fang, X.J., Zhang, X.F., & Chen, J. (2018). Low carbon flexible job shop scheduling based on improved non-dominated sorting genetic algorithm-II. International Journal of Simulation Modelling, 17(4), 712-723.
- Shen, L. (2014). A tabu search algorithm for the job shop problem with sequence dependent setup times.Computer & Industrial Engineering, 78, 95-106.
- Shen, L. Dauzere Peres, S., & Neufeld, J. (2018). Solving the flexible job shop scheduling problem with sequence-dependent setup times. European Journal of Operational Research, 265, 503-516.
- Wang, Y., & Zhu, Q. (2021). A Hybrid Genetic Algorithm for Flexible Job Shop Scheduling Problem with Sequence-Dependent Setup Times and Job Lag Times. IEEE Access, 9, 104864 – 104873.
- Wu, X., Peng, J., Xiao, X., &Wu, S. (2021). An effective approach for the dual-resource flexible job shop-scheduling problem considering loading and unloading, Journal of Intelligent Manufacturing, 32,707–728.
- Xiang, X., Liu. C., & Miao1, L. (2018). Minimizing the Maximum Flow Time for Flexible Job Shop Problem with Parallel Machines Considering Release Time. Advances in Intelligent Systems Research, 159, 208-211.
- Yang, X., Zeng, Z., Wang, R., & Sun, X. (2016). Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times. PLOS ONE, 11(12), 1-13.
- Yazdani, M., Aleti, A., Khalili, S.M, & Jolai, F. (2017). Optimising the sum of maximum earliness and tardiness of the job shop scheduling problem. Computers & Industrial Engineering, 107, 12-24.
- Zambrano Rey, G., Bekrar, A.,Trentesaux, D., & Zhou, B. (2015). Solving the flexible job-shop just-in-time scheduling problem with quadratic earliness and tardiness costs. International Journal of Advansed, 81(9), 1-2.
- Zegordi, S.H, Rahimi& Ghashghaie, M. (2010). Flexible job shop scheduling problem; considering maintenance constraint, Industrial Engineering & Management Sharif, 26(1), 101-115 (In Persian).
- Zhang, R., & Chiong, R. (2016). Solving the energy-efficient job shop scheduling problem: A multi-objective genetic algorithm with enhanced local search for minimizing the total Weighted tardiness and total energy consumption, Journal of Cleaner Production, 112, 3361-3375
|